Comprehensive Colon Hydrotherapy Machine Maintenance Checklist
Regular maintenance is crucial for ensuring the safety, efficiency, and longevity of your MAIKONG Colon Hydrotherapy Machine. Our engineers have developed this detailed checklist based on extensive research and field experience to help you maintain your equipment in optimal condition.

Regular professional maintenance ensures optimal performance and safety
Daily Maintenance Procedures
| Maintenance Task | Procedure | Importance |
| External Surface Cleaning | Wipe all external surfaces with approved disinfectant. Pay special attention to control panels and touch points. | Critical |
| Water Filter Inspection | Check water filter indicator and clarity. Replace if indicator shows necessity. | High |
| Tube System Disinfection | Run disinfection cycle as per MAIKONG protocol using approved solutions. | Critical |
| Temperature Calibration Check | Verify water temperature is calibrated to 37°C (±1°C) using external thermometer. | High |
| System Leak Check | Inspect all connections and tubes for leaks during test cycle. | Critical |

MAIKONG’s advanced filtration system requires regular inspection and maintenance
Weekly Maintenance Procedures

- Deep clean all external surfaces with approved hospital-grade disinfectants
- Inspect and clean water inlet filters
- Check and calibrate pressure system (should maintain 0.6Pa as specified)
- Verify flow rate accuracy (maximum 2L/min)
- Test all emergency stop functions
- Inspect all tubing for wear, discoloration, or damage
- Clean and disinfect drainage systems
- Check all electrical connections
Monthly Maintenance Procedures
Monthly maintenance is critical for ensuring the long-term reliability of your MAIKONG Colon Hydrotherapy Machine. These more comprehensive checks help identify potential issues before they affect performance or patient safety.
- Replace main water filters according to usage volume
- Descale water heating system using approved solutions
- Calibrate temperature sensors against external reference
- Test and calibrate all safety systems including overflow protection
- Inspect and clean internal pump systems
- Check and update software/firmware if updates are available
- Verify accuracy of all displays and indicators
- Conduct full system pressure test under operating conditions
- Document all maintenance activities in system log

Monthly maintenance includes comprehensive system checks and calibration
Quarterly Maintenance Procedures

Quarterly maintenance should be performed by certified MAIKONG technicians
Quarterly maintenance should ideally be performed by certified MAIKONG technicians or authorized service partners. These comprehensive checks ensure all systems are operating at peak efficiency and comply with safety standards.
| System Component | Maintenance Procedure | Required Tools |
| Peristaltic Pump System | Complete disassembly, cleaning, lubrication, and calibration | MAIKONG Service Kit #M101 |
| Temperature Control System | Full calibration against certified reference, heating element inspection | Calibrated thermometer, MAIKONG Service Kit #M102 |
| Water Purification System | Complete replacement of all filters, UV system check, sanitization | MAIKONG Filter Kit #M103, Sanitization Solution |
| Control System | Software update, sensor calibration, touch screen calibration | MAIKONG Diagnostic Software, USB Update Tool |
| Safety Systems | Comprehensive testing of all safety features, backup systems check | MAIKONG Safety Test Kit #M104 |
Schedule Professional Maintenance
Our certified technicians can perform comprehensive maintenance to ensure your Colon Hydrotherapy Machine operates at peak efficiency. Contact us to schedule service.














